Many facility owners are surprised when an environmental rehabilitation plan is requested as part of their permit requirements, assuming it applies only to contaminated sites. In fact, it is required for a number of activities starting at the construction stage.

Official Definition

The Executive Regulations for Environmental Permits define environmental rehabilitation as any action taken at an environmentally degraded or damaged site to restore its natural state of ecological balance, in accordance with standards established by the competent authority.

When Is the Plan Required?

  • For a construction environmental permit for Category I activities: The Center requires its approval of an environmental rehabilitation plan for the activities specified under the Executive Regulations for Environmental Rehabilitation, alongside an environmental management plan.
  • For environmental approval for construction and operation: The Saudi Business Center platform lists the submission of an environmental rehabilitation plan prepared by a licensed provider, together with a declaration that the activity has no degraded or contaminated sites.
  • At closure: The Center may include requirements governing the closure of activities in the operating permit conditions, and site rehabilitation is a natural part of those requirements.
  • When damage is discovered: The permit holder is responsible for addressing any environmental impact that emerges but was not identified in the submitted studies.

Activities Commonly Associated with Rehabilitation

  • Quarries and crushing operations, where the land's contours and cover are altered.
  • Fuel stations and chemical storage facilities, due to the potential for soil and groundwater contamination.
  • Older industrial sites when they are closed or their use changes.
  • Waste storage or disposal sites.

What Does the Plan Typically Include?

  1. A description of the site's current condition and the impacts it has sustained.
  2. Rehabilitation objectives and the target condition to be achieved.
  3. Remediation measures, including treatment of contaminated soil, if present.
  4. A timeline and assigned responsibilities.
  5. A monitoring program to verify that the objectives have been achieved.

Who Prepares the Plan?

The requirements stipulate that the plan must be prepared by a service provider licensed by the National Center for Environmental Compliance. The scope of Category C includes plans for rehabilitating damaged sites and remediating contaminated soil.

How APAC Green Can Help

We prepare an environmental rehabilitation plan for your facility as part of the permit application package, at closure, or when contamination is discovered, and monitor its implementation until its objectives are achieved. Contact us about your site.