Environmental Permit for Facilities in Saudi Arabia
We obtain your facility's environmental permit from the National Center for Environmental Compliance: we complete the classification form, prepare the environmental management and rehabilitation plans for Category 1 activities, and follow your application until the construction or operation permit is issued.
What is the environmental permit service?
An environmental permit is issued by the National Center for Environmental Compliance (NCEC) before any activity expected to affect the environment can start. There are two types: a construction permit, required before any building or modification works, and an operation permit, required before the activity starts operating. On the Saudi Business Center platform the two services are called “environmental approval for construction” and “environmental approval for operation”. Many people search for it as an “environmental license”, but for a facility the document is the permit.
In this service, Abak Green handles your whole file: we determine your activity category, prepare the required environmental study within the scope of our Category (B) license, handle the Category 3 study file, and submit and follow your application until the permit is issued.
When do you need an environmental permit?
- Before building a factory, workshop, warehouse, fuel station, healthcare facility or any activity with an environmental impact.
- Before operating a facility whose construction is complete.
- Your facility already operates without a construction permit and needs to regularise its environmental status.
- You plan to expand the activity or change its type or size: the change requires a new operation permit.
- You received a violation for operating without a permit.
- You are moving the activity from one site to another.
Steps to obtain an environmental permit
- Initial review of your activity: its type, size, location and proximity to sensitive areas.
- Completing the environmental classification form and submitting it with the documents. NCEC decides the activity category within 10 working days, and the review fee is SAR 500.
- Preparing the study required for the category:
• Category 1: an environmental management plan, and a rehabilitation plan for the listed activities and degraded sites.
• Category 2: a Category 2 environmental impact assessment.
• Category 3: a scoping report, then a Category 3 environmental impact assessment. - Applying on the permits platform with the study and documents attached.
- Paying the fee for the category.
- Following the application and answering NCEC's comments until the permit is issued.
What does the environmental permit service include at Abak Green?
| Item | Details |
|---|---|
| Category assessment | Analysing the activity and estimating its category before applying, in line with NCEC's classification requirements |
| Classification form | Completed accurately: location, coordinates, raw materials, energy, fuel and activity code |
| Environmental studies | Environmental management plan, rehabilitation plan, and environmental impact assessment for Category 2 activities |
| Supporting requirements | Declaration that there are no contaminated sites, and coordination on the industrial license and energy efficiency certificate when needed |
| Submission and follow-up | Submitting the application, answering comments and following the decision |
| After the permit | Explaining the permit conditions to your team and scheduling periodic requirements |
Regulations governing the environmental permit
- The Environmental Law issued by Royal Decree No. (M/165) dated 19/11/1441 AH.
- Implementing Regulations for Environmental Permits for Establishing and Operating Activities: set the three categories, the classification form, the requirements of each category and permit validity.
- Implementing Regulations for Environmental Impact Assessment: govern Category 2 and Category 3 studies.
- Implementing Regulations for Financial Consideration: set the permit fees.
Key rules:
| Item | Rule |
|---|---|
| Construction permit validity | 3 years, extendable by 2 years for major projects |
| Operation permit validity | 3 to 6 years depending on the size and complexity of the activity |
| Construction permit time | 10 working days for Category 1, 30 for Category 2 and 60 for Category 3 |
| Construction permit fee | SAR 500 for classification, then SAR 1,000 for Category 1, SAR 10,000 for Category 2, and SAR 13,000 to 275,000 for Category 3 depending on capital |
| Annual operation fee | Impact factor × activity size × compliance factor (0.8 to 1.2) |
| Proximity to sensitive areas | An activity inside a sensitive area, or 500 metres or less from it, needs a detailed impact assessment |
| Coastal works | Filling or dredging within 400 metres of the shoreline needs approval from the Permanent Committee for the Protection of the Coastal Environment |
| Study language | Arabic; NCEC may accept some studies in English |
Why choose Abak Green for your environmental permit?
- Licensed by NCEC under Category (B), license No. ELESL-2026-000173, so our studies are officially accepted.
- Our license covers environmental management and rehabilitation plans for all categories, and environmental impact assessments for Category 2.
- Fewer comments from the start: we review the form and study before submission to avoid requests for missing information.
- Experience of our parent company, Abak Engineering Consulting, in projects and technical drawings.
How we work with you
- You send your activity type and city by WhatsApp or phone.
- We review your situation and set out the expected category and requirements.
- We send a clear quotation with scope and timeline.
- We collect the documents and start preparing the file.
- We submit the application and follow it until the permit is issued.
- We hand over the permit with a summary of its conditions and upcoming deadlines.
FAQs about Environmental Permit
How long does it take to obtain an environmental permit?
The classification decision takes 10 working days. The construction permit then takes 10 working days for Category 1, 30 for Category 2 and 60 for Category 3, plus the time needed to prepare the study.
How much is the environmental permit fee?
Classification costs SAR 500. The construction permit costs SAR 1,000 for Category 1, SAR 10,000 for Category 2, and SAR 13,000 to 275,000 for Category 3 depending on capital. The operation permit has an annual fee calculated from the activity type, its size and its compliance level.
Is a construction permit enough to operate the facility?
No. The operation permit is separate and must be obtained before the activity starts.
My facility operates without a permit. What should I do?
NCEC offers an operation permit service for projects already built without a construction permit. It requires an environmental management plan for Category 1, or an environmental audit study for Categories 2 and 3.
Can the activity category be lowered?
Yes. You may request reclassification if you show modifications or measures that reduce the environmental impact.
What is the fine for operating without an environmental permit?
It starts at SAR 5,000 for Category 1, SAR 20,000 for Category 2 and SAR 50,000 for Category 3, and the violator must also remove the violation and repair the damage.
Ready to start?
Send us your activity type and city, and we will define your requirements and next step.
Related Articles & Guides
-
Permits & Licenses
Environmental Permit Types in Saudi Arabia: Requirements and Application Steps
Explore Saudi environmental construction and operating permits, category requirements, application steps, and timelines. Consult licensed Ab...
Read article
-
Permits & Licenses
Environmental Requirements for Facilities in Saudi Arabia: A Comprehensive Guide
A guide to environmental requirements for Saudi facilities: permits, waste, air, noise, water, and soil, with a reference table of regulatio...
Read article
-
Permits & Licenses
The Environmental Classification Form Step by Step
How to fill the NCEC environmental classification form: required data, review fee, decision time and mistakes that delay it.
Read article