Specialized Studies & Services

Environmental Measurements: Air Quality, Noise and Emissions

We handle your facility's environmental measurements file: stack emissions, air quality and noise measured on schedule, with results reviewed, recorded and built into your compliance reports.

NCEC licensed, Category (B) Follow-up until a decision is issued
Environmental Measurements

Environmental measurements are required of a facility because its activity releases something measurable into its surroundings: smoke from a stack, dust from grinding and loading, or noise that neighbours can hear. The first reference for what must be measured and when is your environmental permit and its conditions, followed by the Implementing Regulations for Air Quality and for Noise under the Saudi Environmental Law. Together they set out, in figures, who must install continuous monitoring, who measures stacks annually, and the noise limits allowed by day and by night. The results do not stay in a drawer: they feed the self-monitoring reports requested by the National Center for Environmental Compliance (NCEC), the environmental register reviewed by inspectors, and the audit file at permit renewal. At Abak Green we handle the whole measurements file: we define what is required, follow up on timely execution, review and record the results, and build a corrective plan where needed.

When does your facility need environmental measurements?

The need usually arises in activities that generate emissions, odours, dust or noise: furnaces, boilers and generators, paints and solvents, crushing, grinding and mixing, and heavy equipment movement. These are the main cases set by the regulations.

Stack and stationary source emissions

The Air Quality Regulations prohibit exceeding emission standards from stationary sources: the general standards in Annex 3 and the industry-specific standards in Annex 4. Follow-up takes one of two forms:

  • Continuous emissions monitoring: for stationary sources listed in Annex 5, using NCEC-approved systems (CEMS, or PEMS with NCEC approval). Operating procedures are submitted within 90 days of installation, and the systems are audited periodically by a licensed service provider.
  • Annual measurement: for sources not subject to continuous monitoring, with annual measurements and analyses of the main pollutants on every stack, each stack measured separately.

A new plant has a fixed deadline for its first measurement: within 120 days of the facility's establishment or 40 days of reaching the target production rate, whichever comes first. A facility classified as a "major source" must notify NCEC 30 working days before measuring and submit the results report within 40 working days.

Air quality and dust

Article 7 of the same regulations requires anyone carrying out excavation, construction, demolition or waste transport, or loading and unloading materials and soil, to cover or stabilise volatile materials by spraying or keep them enclosed, and to stabilise haul routes on site. This directly concerns concrete plants, crushers, feed mills and construction sites, and measuring dust and air quality around these activities shows whether the controls actually work.

Noise at the site boundary

The Noise Regulations set limits in dB(A) for each type of area: 70 by day and 65 by night in industrial areas, measured at the outer boundary of the activity, and from 50 to 60 by day and 40 to 50 by night in residential areas depending on density. Daytime runs from 7 a.m. to 8 p.m. Where the permit requires noise monitoring, the data is kept for at least three years. NCEC may request noise modelling on maps and a reduction plan in three cases: when a permit is requested for a new activity, when a complaint is filed against an existing one, or based on inspection or audit findings.

Measurements in permits, inspections and audits

The Implementing Regulations for Environmental Permits require that the studies, plans, analyses and measurements they contain come from a service provider licensed by NCEC. The environmental audit required to renew the operating permit for Category 2 and 3 activities reviews emissions, discharges and measurement results. The Inspection and Audit Regulations treat refusing sample collection, and including incorrect information in reports and records submitted to NCEC, as violations, so a poorly documented result can become a violation in itself.

What we provide

  • Review of your permit and its conditions to define the required measurements, points and frequency: emissions, air quality and dust, and noise.
  • An inventory of on-site emission sources: stacks, combustion equipment such as generators and pumps, and sources of dust and volatile organic vapours.
  • Determining whether your sources fall under continuous monitoring or annual measurement, and whether your facility is a major source that must notify in advance.
  • Scheduling measurements on time, carried out by an NCEC-licensed provider using the sampling and analysis methods set by the regulations.
  • Reviewing results against the general and industry-specific standards and the noise limits for your area.
  • Keeping measurement records as the regulations require: date, time, location and provider, instrument type and serial numbers, and conditions such as wind, temperature and humidity.
  • Building the results into self-monitoring and compliance reports, ready for inspection and audit.
  • A corrective plan for any exceedance, and preparing a temporary exemption request for emissions or a temporary exceedance permit for noise when an exceedance is expected for technical reasons or construction works.

How we work

  1. File review: your permit, its conditions and any previous measurement reports.
  2. Site visit: we map emission, noise and dust sources and set the measurement points and site boundary.
  3. Measurement plan: what is measured, where, how often, and any advance notification dates.
  4. Execution: measurements are taken on schedule, under operating conditions that reflect your actual activity.
  5. Review and records: results are compared with the applicable limits and filed in your environmental register.
  6. Reporting and follow-up: results go into your reports, with a corrective plan for any exceedance and a follow-up measurement to verify it.

FAQs about Environmental Measurements

What is the difference between continuous emissions monitoring and annual stack measurement?

Continuous monitoring is mandatory for stationary sources listed in Annex 5 of the Air Quality Regulations, using NCEC-approved systems. Sources not subject to it have annual measurements and analyses of the main pollutants on all stacks. NCEC may also require continuous monitoring from unlisted sources based on study results.

When is the first emissions measurement for a new plant?

Within 120 days of the facility's establishment or 40 days of reaching the target production rate, whichever comes first, covering all stacks.

What noise levels are allowed around facilities?

In industrial areas, 70 dB(A) by day and 65 by night at the outer boundary of the activity. In residential areas, 50 to 60 by day and 40 to 50 by night depending on density, under the Noise Regulations.

When is an environmental noise study and reduction plan required?

NCEC may request noise modelling and a reduction plan when a permit is requested for a new activity, when a complaint is filed against an existing activity, or based on inspection or audit findings.

How long must measurement and monitoring records be kept?

Records for stationary sources and their monitoring systems, including operation, maintenance, calibration and performance tests, for at least five years. Noise monitoring data, where the permit requires it, for at least three years, provided to NCEC on request.

What if results exceed the allowed limits?

The causes are identified, control systems repaired and the measurement repeated to verify. NCEC is notified immediately in emergencies. Where an exceedance is expected for technical reasons, a temporary exemption can be requested with a technical study and a plan to return to compliance.

Documents we need from you

  • A copy of your environmental permit and its conditions, and any previous inspection notes.
  • A site plan showing stacks, emission sources and noisy equipment.
  • An equipment list: furnaces, boilers, generators and compressors, with operating hours and production rate.
  • Previous measurement reports and maintenance and calibration records for control and monitoring systems.
  • Any complaints log, especially neighbours' complaints about noise or odours.

Sectors we serve

Why Abak Green?

Abak Green Environmental Consulting is a company holding a Category (B) environmental license from NCEC, number ELESL-2026-000173, which you can verify on our license page. We do not treat measurements as isolated figures: we tie them to your permit, environmental register and reports, track their dates under the annual environmental compliance contract, and review them before the environmental audit and permit renewal. Your compliance record over the permit term feeds the environmental compliance factor used to calculate the annual fee of the operating permit, ranging from 0.8 for highly compliant activities to 1.2 for low compliance.

Further reading: emissions and air quality obligations of industrial facilities and noise at facilities and construction sites.

Ready to start?

Send us your activity type and city, and we will define your requirements and next step.