A mall or large commercial complex needs an environmental permit from the National Center for Environmental Compliance if its activity requires one. The center determines its category based on the classification form. Anyone familiar with malls knows they are like small cities: hundreds of tenants, a food court, backup generators, large cooling systems, parking lots, and waste collected every day.

This guide explains environmental permits for malls from design through operation and addresses the most common questions: waste, food court restaurants, generators and cooling, water, and the responsibilities of owners versus tenants.

The Environmental Permit Process for Malls

  1. Activity classification before final design: floor area, energy, generators, water, and the project location and its surroundings. The published processing time is 10 business days, and the fee is SAR 500.
  2. Construction permit according to category: an environmental management plan for Category 1, an environmental impact assessment study for Category 2, or a scoping report and environmental impact assessment study for Category 3.
  3. Construction site management: dust, noise, and construction and demolition waste throughout construction.
  4. Operating permit before opening: an operational environmental management plan for Category 1, or an environmental audit study for Categories 2 and 3.
  5. Monitoring reports after opening, in accordance with permit conditions.

For smaller complexes and standalone shops, read Environmental Requirements for Opening a Retail Store.

The Construction Phase

Building a mall takes months or years, and its impact on neighboring areas begins before opening: dust from excavation and material transport, equipment noise, and large quantities of construction and demolition waste. The site's environmental management plan addresses all these issues, and contractors are required to comply with it through their contracts. Read Environmental Requirements for Construction Sites and Construction and Demolition Waste Management.

Waste: The Mall's Biggest Operational Environmental Issue

Article 12 of the Waste Management Law states that residential and commercial complexes must contract with a licensed service provider. Waste in a mall comes from different sources, each requiring a different approach to sorting:

SourceWasteManagement Measures
Retail storesLarge quantities of cardboard and packagingSorting for recycling and balers in the loading area
Food courtFood scraps and used cooking oilSeparation of organic waste and collection of oils by a licensed provider
MaintenanceOils, filters, batteries, and lampsSeparate storage as hazardous waste and handover to a licensed transporter
Visitors and corridorsMixed general wasteClearly labeled sorting bins and regular collection

Read Waste Management in Residential and Commercial Complexes.

Food Court Restaurants: Grease and Odors

Cooking oils and grease discharged into the sewer network cause blockages and pollution. Every kitchen therefore needs a grease trap, a cleaning schedule, and a licensed provider to collect used oil. In a mall, it is better for the owner to manage this centrally through lease conditions rather than leave each tenant to handle it individually.

Backup Generators and Cooling

  • Generators: Their exhaust stacks are stationary sources subject to the requirements of the Air Quality Regulations, and their fuel must be stored with secondary containment. Read Environmental Requirements for Backup Generators.
  • Air conditioning and cooling systems: Under Article 9 of the Environment Law, ozone-depleting refrigerants are subject to phaseout plans prepared by the competent authority. Maintenance records and refrigerant refill quantities also help identify leaks.

Water and Wastewater

Malls consume large amounts of water in restrooms, restaurants, cooling towers, and irrigation. Their wastewater carries restaurant grease and cleaning water. Basic requirements include submeters for each use, grease traps, and separation of stormwater from wastewater. Read The Water Footprint of Companies.

Noise and Neighbors

Malls near residential neighborhoods can be a source of complaints due to nighttime loading trucks, rooftop air conditioning equipment, and events. Noise limits under the Executive Regulations for Noise vary by area classification, with stricter limits at night than during the day. Scheduling loading times and soundproofing equipment cost less than dealing with a complaint. Read Environmental Complaints from Neighbors.

Parking Lots and Loading Areas

Large parking lots collect rainwater along with vehicle oil residues, while loading areas bring together waste and trucks. Separating stormwater drainage from sanitary wastewater, cleaning parking lots regularly, and organizing loading areas with closed containers all help prevent the mall from becoming a source of pollution for its surroundings.

Environmental Performance Indicators for Malls

IndicatorData Source
Monthly waste quantities by typeHandover documents issued to the licensed service provider
Percentage of waste recycledRecycled waste divided by total waste
Electricity and water consumption per leased square meterMain meters and submeters
Generator operating hours and fuel consumptionOperating logs and fuel invoices
Complaints from neighborsComplaint log

These indicators support operations first, then sustainability reporting if requested by investors or major tenants.

Owner or Tenant: Who Is Responsible?

Environmental MatterOwner or OperatorTenant
The mall's environmental permitYes—
General waste contract and collection pointsYesCompliance with sorting requirements and collection schedules
Restaurant grease trapRequire it in the lease and monitor complianceCleaning and recordkeeping
Generators and central air conditioningYes—
A tenant activity with a specific environmental impactInclude the requirement in the leaseObtain a separate permit if the activity requires one

The practical rule is that shared matters are managed by the owner, while requirements specific to an individual tenant's activity are assigned to that tenant in the lease.

Common Mistakes

  • Leaving waste management to each tenant without a centralized system, allowing waste to mix and accumulate.
  • Leases without environmental clauses for food court restaurants.
  • Expanding or adding an activity such as a cinema or play area without reviewing the permit. Read Amending an Environmental Permit.
  • Neglecting generator and cooling system records.

Mall Management Checklist

  • The permit is valid and covers the current area and activities.
  • A waste contract is in place with a licensed service provider, with sorting for cardboard, organic waste, and hazardous waste.
  • Every restaurant has a grease trap and a cleaning log.
  • Generator and air conditioning maintenance records and required stack measurements are maintained.
  • Leases include environmental clauses.
  • A process is in place to receive and address complaints from neighbors.

How Can APAC Green Help?

We manage the mall's environmental permitting process from classification through the operating permit, prepare an environmental management plan covering waste, restaurants, and generators, recommend environmental clauses for tenant leases, and prepare monitoring reports after opening.

Obtaining an Environmental Permit · Send your project details for a preliminary review

Frequently Asked Questions

Does a mall need an environmental permit?

If its activity requires a permit, the National Center for Environmental Compliance determines its category based on the classification form. A construction permit is then required, followed by an operating permit.

Must a commercial complex contract with a licensed waste company?

Yes. Article 12 of the Waste Management Law states that residential and commercial complexes must contract with a licensed service provider.

Who is responsible for grease traps in mall restaurants?

The tenant cleans them and maintains records, while the owner requires them in the lease and monitors compliance.

Does every mall tenant need a separate permit?

A tenant whose activity has a specific environmental impact may need its own permit, while shared matters are managed by the owner under the mall's permit.

What are the environmental requirements for a mall's backup generators?

Their exhaust stacks are stationary sources subject to the requirements of the Air Quality Regulations, their fuel must be stored with secondary containment, and their maintenance must be documented.

Does adding a new activity in a mall require approval?

If it changes the nature of the activity or the scale of its impact, the permit must be amended or the activity added before implementation.

How can a mall reduce noise complaints?

By scheduling loading times, soundproofing rooftop air conditioning equipment, and observing the stricter nighttime noise limits in the regulations.

What is the most complex environmental issue for a mall?

Waste, because it comes from multiple sources, including stores, restaurants, maintenance, and visitors, each requiring different sorting arrangements and collection providers.

Does a mall need periodic environmental measurements?

This depends on its permit conditions, which may include generator stack measurements under the Air Quality Regulations and monitoring reports prepared by a licensed service provider.

Official Sources