An Environmental Management Plan (EMP) sets out the procedures a facility commits to following to maintain environmental compliance. It is the primary requirement for a construction permit for Category I activities and part of the operating permit requirements.

Many people look for a ready-made “environmental management plan template.” A template is useful for understanding the structure, but keep two points in mind: the plan must be prepared by an environmental service provider licensed by the Center, and a generic template will not be accepted unless it is tailored to your activity and location.

Environmental Management Plan Template Structure

# Section What to Include
1 Facility Information Name, commercial registration, location and coordinates, activity, and classification category
2 Service Provider Information Name and license number issued by the Center
3 Activity Description Processes, raw materials and quantities, energy and fuel, operating hours, and number of employees
4 Site and Surroundings Description Surrounding areas and sensitive receptors (homes, schools, hospitals, water bodies), with a map
5 Environmental Aspects and Impacts For each component: air, noise, water and wastewater, soil, waste, and odors
6 Mitigation Measures A specific, practical measure for each impact
7 Environmental Monitoring Plan What is measured, where, how often, who is responsible, and which limit it is assessed against
8 Waste Management Types, quantities, storage, and licensed receiving entities
9 Environmental Emergency Plan Scenarios, response procedures, responsibilities, and contact numbers
10 Roles and Responsibilities Who implements each measure
11 Training Employee training on implementing the plan
12 Records Required documentation forms
13 Budget and Timeline Implementation costs and schedule

Sample Entries in an Impacts and Mitigation Measures Table

Component Source Impact Mitigation Measure Indicator Frequency Responsible Person
Air Standby diesel generator Emissions Regular maintenance and an exhaust stack of appropriate height Emission measurements As specified in the permit requirements Maintenance officer
Waste Used oils from maintenance Soil contamination Store in sealed drums within secondary containment and hand over to an entity licensed by MWAN Handover documents At each handover Warehouse officer

For illustration only; the details are developed according to each facility's activity.

Sample Entries for Different Activities

ActivityImpactMitigation MeasureIndicator
Auto Repair WorkshopOil leakage onto floors and into drainsImpermeable flooring, secondary containment for drums, and an oil interceptorInterceptor cleaning log and oil handover documents
Chemical WarehouseSpills during loadingA loading area with secondary containment, absorbent materials, and employee trainingSpill and training records
Restaurant or Central KitchenGrease in wastewaterA grease trap and collection of used cooking oilTrap cleaning log and quantities of oil handed over
Construction SiteDust affecting neighborsCover materials, spray water, and stabilize access routesDocumented daily inspections

Note that every indicator can be verified through a record. If you cannot show the inspector evidence of a measure, the inspector will consider it unimplemented.

Monitoring Log Template

The plan specifies what to monitor, and the log proves that monitoring took place. Its simplest form is a table with these columns:

DateItemReading or ObservationCompliant?Action if NoncompliantResponsible Person
…Oil interceptor cleaningCompleted; the collected quantity was handed over to a licensed transporterYes—Workshop supervisor
…Secondary containment inspectionCrack in the cornerNoRepair within one week and reinspectMaintenance officer

Common Mistakes That Cause Plan Rejection or Delays

  • A copied generic template that does not describe the facility's actual processes.
  • Generic mitigation measures such as “comply with regulations” instead of a specific, verifiable measure.
  • A monitoring plan without numerical details: it does not specify what is measured, the limit, or the frequency.
  • Omitting sensitive receptors around the site.
  • No emergency plan.
  • Preparation by an unlicensed entity, which is grounds for outright rejection.

Construction Plan vs. Operating Plan: What Is the Difference?

Construction-Phase PlanOperating-Phase Plan
When to SubmitWith the Category I construction permit applicationWith the Category I operating permit application, in updated form
What It CoversConstruction work: dust, noise, waste, and equipmentDaily operations: emissions, wastewater, waste, and hazardous materials
Accompanying DocumentsA rehabilitation plan for activities for which the regulation requires one, and an undertaking to implement itAn undertaking to implement the plan's findings and recommendations
At RenewalNot applicableUpdated if anything at the facility has changed

A common mistake is submitting the same construction plan when applying for an operating permit. The Category I operating permit service page explicitly requires an updated operating plan.

Waste Management Within the Plan

The waste section receives the most scrutiny in practice. Present it as a table covering each waste type:

TypeTemporary Storage LocationReceiving EntityEvidence
General WasteCovered containersLicensed service providerContract and invoices
RecyclablesSeparate containers by material typeLicensed recyclerHandover documents
Hazardous Waste (Oils, Solvents, Batteries)Roofed area with secondary containmentLicensed hazardous waste transporterA transfer document for each handover

Training and When to Review the Plan

The plan will not be implemented if the people responsible for carrying it out are unfamiliar with it. Specify who receives training, on what topics, and when: orientation for new employees, practical training on spills and emergencies, and periodic refreshers.

Review the plan when processes, equipment, or materials change, after any environmental incident, and when renewing the permit. A plan that has remained unchanged for years at a facility that has changed no longer describes that facility.

Plan Appendices

The appendices turn the plan from a written document into a verifiable file:

  • A map of the site and its surroundings showing sensitive receptors.
  • A facility layout showing drainage routes and storage areas.
  • A list of hazardous materials and safety data sheets for each.
  • Waste service providers' contracts and licenses.
  • Blank record forms to be used.
  • The license of the service provider that prepared the plan.

Pre-Submission Checklist

  • The plan was prepared by a service provider licensed by the Center, and its license number is included.
  • The processes, materials, and equipment listed are those actually present at your facility.
  • Each impact has a specific measure, and each measure has an indicator, a frequency, and a responsible person.
  • Sensitive receptors around the site are identified on a map.
  • The emergency plan covers spills, fires, and leaks.
  • Record forms are ready, and those responsible for them know their responsibilities.
  • The facility can actually implement everything in the plan.

After Plan Approval

The approved plan is binding. Violating its requirements carries a fine of SAR 500 per requirement for Category I, SAR 2,000 for Category II, and SAR 5,000 for Category III. The Center may monitor its implementation throughout the activity's lifetime. Therefore, include only what you can actually implement.

Request the Template

Button: Request the Environmental Management Plan Template ← Opens the contact form until the downloadable template is ready.

How Can Abak Green Help?

As a Category B environmental service provider licensed by the National Center, we prepare an environmental management plan tailored to your facility's activity and location, follow it through to approval, and explain to your team how to implement it.

Environmental Management Plan · Request a Plan for Your Facility

Frequently Asked Questions

Can I use a ready-made environmental management plan template?

A template illustrates the structure, but the plan must be tailored to your activity and location and prepared by a licensed service provider.

What sections does an environmental management plan include?

Facility, activity, and site information; impacts and mitigation measures; a monitoring plan; waste management; emergencies; responsibilities; training; and records.

Who prepares an environmental management plan?

An environmental service provider licensed by the National Center for Environmental Compliance.

Is the plan binding after approval?

Yes. Violating its requirements carries a fine for each requirement.

Who prepares an environmental management plan for submission to the Center?

An environmental service provider licensed by the National Center for Environmental Compliance, in accordance with the requirements on the Category I construction and operating permit service pages.

Do I need a new plan when renewing the permit?

For Category I activities, the operating plan is updated at renewal if the facility has changed, according to the operating permit renewal service page.

What is the difference between a construction plan and an operating plan?

The first covers construction work and is submitted with the construction permit application. The second covers daily operations and is submitted in updated form with the operating permit application.

What should be included in the plan's waste section?

Each waste type, its temporary storage location, the licensed entity receiving it, and the document proving handover.

Can one facility's plan be used for another facility with the same activity?

No. The location, equipment, materials, and surroundings differ. The plan must describe the facility for which it is submitted, not the activity in general.

Official Sources